The project covered a winding stretch of roadway through Kandiyohi County. The scope of work included placement of two lifts of mix on the road, paving at the ends of residential driveways, topsoil placement, and construction of a bike trail.
“Our crews were there when they were needed, and overall, we completed the project in a timely way.”
-Blaine Shoenecker, Duininck Operations Manager – Paving





